Inland Mariners logo / link to home page
Banner image: John Sherwin
John Sherwin at Lamborn draw
Steamer John Sherwin along Lamborn Ave. Draw Fraser Shipyard
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8115

John Sherwin at Lamborn draw
John Sherwin in preparation for for possible towing to Chicago for grain storage barge.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8094

Shipyard workersw
Bob Linn and Bill Rhodes, Fraser Shipyard's fitters replace gaskets
along port side gangway door on Sherwin.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8064

Propeller shaft welded into locked position
The propeller shaft on the Sherwin locked into an unmovable
position in preparation for towing.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8074

Cargo hold weld
Opening in cargo hold has been sealed. The opening was created several
years ago when the bow thruster engine was removed from the vessel.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8100

Shipyard workers on deck
Shipyard workers have been replacing the Sherwin's hatch clamps on
the spar deck. Brian Pierce burning off old parts on this clamp.
S/S John Sherwin, Superior WI ,July 28, 2006, Image 06-8078

Shipyard workers on deck
Fraser Shipyard workers Sid Oswskey, (L) and
Todd Pietrowski at work on the deck of the John Sherwin.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8083

Ray Olaf and Eric Sorenson
Fitters Ray Olaf, and Eric Sorenson
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8090

Hatch clamps
A few of the 1,920 hatch clamps. The Sherwin has not been
outside of the Duluth-Superior harbor since November, 1981.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8108

Pilothouse interior, John Sherwin
Quick look at the pilot house interior of the steamer John Sherwin.
S/S John Sherwin, Superior WI, July 28, 2006, Image 06-8097

Return to top